A turnkey construction project is a fully completed project delivered to the client, including all finishing works and installations, ready for immediate occupancy from the very beginning of the project.
We provide services in Alaçatı, Ilıca, Dalyan, Reisdere, Germiyan, and all central neighborhoods of Çeşme. Upon request, we also accept projects in nearby districts.
Waterproofing extends the lifespan of the structure, prevents moisture buildup, and provides energy efficiency. It is especially important in humid areas like Çeşme.
Roof insulation is generally carried out in the spring and summer months. It is not recommended during the rainy season.
Depending on the size of the project, the rough construction of an average villa is typically completed within 1 to 3 months.
Land condition, project size, the quality of materials used, and additional requests directly affect the costs.
Most renovation works can make living in the house difficult. It is especially recommended to vacate the house during bathroom, kitchen, and flooring renovations.
Yes, our company handles the design process, municipal permits, and all legal procedures.
We use various methods such as bituminous membrane, polyurethane coating, liquid waterproofing, and injection systems.
Due to the high demand during the summer season, we recommend spring or autumn. This allows for easier planning of material supply and labor.
It refers to the reinforcement processes applied to columns, beams, and foundations to increase the earthquake resistance of existing buildings.
The process begins with needs analysis, followed by architectural design, structural project planning, material selection, and permitting, after which implementation begins.
It depends on the size of the building; for an average residence, it is completed within 2 to 4 weeks.
Pricing is done after an on-site assessment based on square meter measurements, material quality, workmanship, and project details.
Material selection should take into account seasonal use, moisture risk, and the effects of the sea.
It depends on the design, but a standard reinforced concrete pool is delivered within 45–60 days.
Yes, we offer insulation solutions for drinking water reservoirs and fire water tanks.
Depending on the scope of the project, it usually takes around 10 to 20 days.
It is easy to clean, antibacterial, long-lasting, and provides a modern appearance.
Yes, we provide material and workmanship warranties on all our projects. The warranty details are specified according to the contract duration.
It prevents moisture, mold, and corrosion in building elements, extending the lifespan of your building and ensuring healthy living spaces.
Yes, we select materials by considering the coastal and humid climate conditions specific to the region.
All our waterproofing and thermal insulation works are covered by warranty, depending on the terms of the contract.
It is usually completed within 5 to 7 days, depending on the surface and weather conditions.
It is lightweight, durable, provides a modern appearance, and contributes to thermal insulation.
We use liquid membrane, brush-on insulation, and under-tile waterproofing systems.
The existing covering is removed, insulation is renewed, the frame is inspected, and a new covering is applied.
If the application will be carried out under contract, we do not charge for site inspection and project design in most cases.
Yes, we have completed numerous projects in Çeşme and its surrounding areas.
Properly applied thermal insulation can provide 30–50% energy savings.
It is preferred for buildings with earthquake risk, weak structural elements, or design deficiencies.
It takes approximately 7 to 14 days. The duration may vary depending on plumbing changes and material supply.
It depends on the project. For large-scale renovations, temporarily vacating the house is recommended.
After the site inspection, a detailed quotation is prepared based on the scope of work, material quality, and duration.
Yes, we develop concept and implementation projects together with our experienced architects.
We prefer crystallized coating, polyurethane membrane, and epoxy coating systems.
After the offer is approved, the contract is prepared, the payment and work schedule are set, and the official process begins.
It is done when the roofing material reaches the end of its lifespan, the waterproofing is insufficient, or there is deformation in the structural frame.
When properly applied, it provides durability for an average of 15 to 20 years.
A protocol is prepared with the landowner, project planning and permit procedures are completed, and then the construction process begins.
As long as the temperature does not drop below +5°C, it can be applied during any season of the year.
Yes. They improve both energy efficiency and aesthetic value.
Yes, our turnkey concept includes landscaping and environmental arrangement services.
Title deed copy, zoning status document, and municipal permit application documents are prepared.
Ceramic tile is more durable in wet areas and high-traffic zones.
Stone cladding resistant to the marine climate, waterproofing materials, and A-class thermal insulation materials are prioritized.
Based on the project scope, a work schedule is created after the site inspection, and the exact duration is specified in the contract.